
Installing MG 1000B Hardware 251
Figure 91
DSP Daughterboard
Installing a DSP Daughterboard
Step Action
1
Place the MGC on a safe ESD surface.
2
Place the DSP Daughterboard in either Daughterboard position 1
(for DSP DB-96) or Daughterboard position 2 (for DSP DB-32),
depending on how the Daughterboard will be configured from a TN
perspective.
3
Ensure the DSP Daughterboard is securely attached to the MGC.
(using supplied screws).
—End—
Installing the MGC card
Table 23
MGC Serial Port Capabilities
Port Modem Support? Used for initial Configuration?
SD10 Yes (requires null modem to
connect to a TTY)
Yes
SD11 No (No hardware flow control) Yes
SD12 No (No hardware flow control) No (Only available after FPGA
is enabled. Not available
during initial configuration
menu display)
Nortel Communication Server 1000
Branch Office Installation and Commissioning
NN43001-314 01.02 Standard
Release 5.0 20 June 2007
Copyright © 2007, Nortel Networks
.
Comentarios a estos manuales