
40 Creating Open Provisioning Interface clients
Figure 12
Task flow for creating OPI clients
Navigation
•
"Downloading the Axis toolkit" (page 41)
• "Retrieving the error codes" (page 41)
• "Configuring the class path" (page 41)
• "Downloading the WSDL file" (page 42)
• "Compiling the client stubs" (page 42)
• "Writing a client to perform some specific OPI operations" (page 43)
Nortel AS 5300
Nortel Application Server 5300 Application Programming Interfaces Reference
NN42040-110 01.01 Standard
11 June 2008
Copyright © 2008 Nortel Networks
.
Comentarios a estos manuales