555-7101-226CallPilotInstallation and ConfigurationPart 2: 703t Server Hardware InstallationProduct release 2.02 Standard 1.01 November 2005555-7101-2
Contents Standard 1.0110 CallPilot
Part 2: 703t Server Hardware Installation 11Chapter 1 703t server descriptionIn this chapter Server features 12Slot assignments 19IRQ mapping table 21
703t server description Standard 1.0112 CallPilotServer featuresIntroductionThis section provides a general overview of the 703t server.Server dimensi
November 2005 703t server descriptionPart 2: 703t Server Hardware Installation 13Front panel features The following diagram shows the 703t server’s fr
703t server description Standard 1.0114 CallPilotThe table below describes the parts that are identified in the preceding diagram: Part FunctionReset
November 2005 703t server descriptionPart 2: 703t Server Hardware Installation 15IDE CD-ROM drive (5.25 in.)Enables you to use the CallPilot software
703t server description Standard 1.0116 CallPilotRear panel diagram The following diagram shows the 703t server’s rear panel features:Note: For more i
November 2005 703t server descriptionPart 2: 703t Server Hardware Installation 17The table below describes the parts that are identified in the preced
703t server description Standard 1.0118 CallPilotEnvironmental specificationsEnvironmental condition SpecificationOperating temperature 10°C to 35°C (
November 2005 703t server descriptionPart 2: 703t Server Hardware Installation 19Slot assignmentsIntroductionThe slot assignment tables show the phys
P0603578
703t server description Standard 1.0120 CallPilotSlot definition and numbering In the following table, the term “slot” refers to the available slot op
November 2005 703t server descriptionPart 2: 703t Server Hardware Installation 21IRQ mapping tableThe following table lists the assignments for each I
703t server description Standard 1.0122 CallPilotIRQ14 INT14 IDE controllerIRQ15 INT15 AvailableInterrupt I/O APIC level Slot or device
November 2005 703t server descriptionPart 2: 703t Server Hardware Installation 23Network connectivityIntroductionThis section describes how the 703t s
703t server description Standard 1.0124 CallPilotSample network setup: Meridian 1The Meridian 1 switch can be one of the following: Option 11C or Opt
November 2005 703t server descriptionPart 2: 703t Server Hardware Installation 25Sample network setup: Succession 1000 The following diagram shows a C
703t server description Standard 1.0126 CallPilotIn the previous diagram, the telephony LAN (TLAN) provides IP connectivity between the Succession 100
November 2005 703t server descriptionPart 2: 703t Server Hardware Installation 27Network requirementsAppropriate networking equipment must be availabl
703t server description Standard 1.0128 CallPilotSupported peripheral devicesIntroductionThis section identifies external devices that are supported b
November 2005 703t server descriptionPart 2: 703t Server Hardware Installation 29Monitor, keyboard, and mouse 15-in. monitor: NTRH9011Since the m
CallPilotInstallation and ConfigurationPart 2: 703t Server Hardware InstallationPublication number: 555-7101-226Product release: 2.02Document release:
703t server description Standard 1.0130 CallPilot
Part 2: 703t Server Hardware Installation 31Chapter 2 Preinstallation requirementsIn this chapter Installation overview 32Unpacking the 703t server 35
Preinstallation requirements Standard 1.0132 CallPilotInstallation overviewIntroductionThis section provides an overview of the steps required to inst
November 2005 Preinstallation requirementsPart 2: 703t Server Hardware Installation 334 Replace the server cover. ❒5 Place the 703t server in the chos
Preinstallation requirements Standard 1.0134 CallPilotConventions for warningsYou may encounter the following types of warnings in this guide. Do not
November 2005 Preinstallation requirementsPart 2: 703t Server Hardware Installation 35Unpacking the 703t serverIntroductionFollow this procedure to un
Preinstallation requirements Standard 1.0136 CallPilot5 Save all packing materials and cartons in case you must return any equipment to the carrier.Wh
November 2005 Preinstallation requirementsPart 2: 703t Server Hardware Installation 37Removing the side coverIntroductionThis section describes how to
Preinstallation requirements Standard 1.0138 CallPilotThe following diagram shows how to remove the side panel. See the instructions for removal below
November 2005 Preinstallation requirementsPart 2: 703t Server Hardware Installation 394 Use one hand to pull the top edge of the cover away from the s
*Nortel Networks, the Nortel Networks logo, the Globemark, and Unified Networks, BNR, CallPilot, DMS, DMS-100, DMS-250, DMS-MTX, DMS-SCP, DPN, Dualmod
Preinstallation requirements Standard 1.0140 CallPilotInspecting the server interiorIntroductionBefore you install the server, you should perform a vi
November 2005 Preinstallation requirementsPart 2: 703t Server Hardware Installation 41you are satisfied that the 703t server has arrived at your site
Preinstallation requirements Standard 1.0142 CallPilotReplacing the side coverIntroductionWhen you are satisfied that the server was not damaged durin
November 2005 Preinstallation requirementsPart 2: 703t Server Hardware Installation 43The following diagram shows how to: 1) align the tabs, 2) engage
Preinstallation requirements Standard 1.0144 CallPilotInstalling the chassis feetIntroductionYou can install feet on the bottom of the server. The fee
November 2005 Preinstallation requirementsPart 2: 703t Server Hardware Installation 451 Ensure that the server is laying on its side, supported to giv
Preinstallation requirements Standard 1.0146 CallPilot
Part 2: 703t Server Hardware Installation 47Chapter 3Installing the server and connecting the peripheral devicesIn this chapterInstalling the server 4
Installing the server and connecting the peripheral devices Standard 1.0148 CallPilotInstalling the serverIntroductionBefore you install the 703t serv
November 2005 Installing the server and connecting the peripheral devicesPart 2: 703t Server Hardware Installation 49Preparing the modemIntroductionYo
Part 2: 703t Server Hardware Installation 5RADISYS is a trademark of Radisys Corporation.ROLM is a trademark of Siemens ROLM Communications Inc. SLR4,
Installing the server and connecting the peripheral devices Standard 1.0150 CallPilotThe following diagram shows the key components of the external mo
November 2005 Installing the server and connecting the peripheral devicesPart 2: 703t Server Hardware Installation 51To set the modem DIP switchesUse
Installing the server and connecting the peripheral devices Standard 1.0152 CallPilotWhat’s next?Continue with “Connecting peripherals to the server”
November 2005 Installing the server and connecting the peripheral devicesPart 2: 703t Server Hardware Installation 53Connecting peripherals to the ser
Installing the server and connecting the peripheral devices Standard 1.0154 CallPilotThe diagram below shows the connectors for the power cord and the
November 2005 Installing the server and connecting the peripheral devicesPart 2: 703t Server Hardware Installation 55To connect the mouse, keyboard, a
Installing the server and connecting the peripheral devices Standard 1.0156 CallPilotConnect the server to the ELAN and CLAN hubs (if applicable).IF t
November 2005 Installing the server and connecting the peripheral devicesPart 2: 703t Server Hardware Installation 57Connecting the server to the ELAN
Installing the server and connecting the peripheral devices Standard 1.0158 CallPilot3 At the switch, connect the ELAN network cable to an MAU (Ethern
November 2005 Installing the server and connecting the peripheral devicesPart 2: 703t Server Hardware Installation 59Connecting the server to the CLAN
6 CallPilotPublication history Standard 1.01
Installing the server and connecting the peripheral devices Standard 1.0160 CallPilotInstalling the Nortel Networks software feature key adapterIntrod
November 2005 Installing the server and connecting the peripheral devicesPart 2: 703t Server Hardware Installation 61RequirementsFor installation, you
Installing the server and connecting the peripheral devices Standard 1.0162 CallPilotConnecting the server to powerBefore you beginEnsure that proper
November 2005 Installing the server and connecting the peripheral devicesPart 2: 703t Server Hardware Installation 63Before you connect the server to
Installing the server and connecting the peripheral devices Standard 1.0164 CallPilotTo connect the server to power1 Plug the server’s AC power cord i
November 2005 Installing the server and connecting the peripheral devicesPart 2: 703t Server Hardware Installation 65Use <arrow up> and <arro
Installing the server and connecting the peripheral devices Standard 1.0166 CallPilot
Part 2: 703t Server Hardware Installation 67IndexNumerics703t serverCLANconnection, establishing 59connector 17connectionsestablishing 62power 62dimen
Index Standard 1.0168 CallPilotSuccession 1000 25front panel 13modem 50rear panel 16, 54server connections, peripheral devices 62server feet, installi
November 2005 IndexPart 2: 703t Server Hardware Installation 69Ppart numberskeyboard 29modem 28monitor 29mouse 28, 29PCI slots 17peripheral devices 28
November 2005 Publication historyPart 2: 703t Server Hardware Installation 7Publication historyNovember 2005Standard 1.01 of the CallPilot Installati
Index Standard 1.0170 CallPilotWwarnings, conventions 34
CallPilotInstallation and ConfigurationPart 2: 703t Server Hardware InstallationCopyright © 2003 Nortel Networks. All Rights Reserved.Information is s
8 CallPilotPublication history Standard 1.01
Part 2: 703t Server Hardware Installation 9Contents1 703t server description 11Server features . . . . . . . . . . . . . . . . . . . . . . . . . . .
Comentarios a estos manuales