Nortel Networks 1000M Manual de usuario Pagina 332

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 458
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 331
Page 332 of 456 Powering up the system and initial loading
NN43021-310 Standard 02.01 December 2007
7 Test the clocks:
a. Verify that the clock controller is assigned to the active Core:
8 Verify that the Clock Controllers are switching correctly:
9 Check applications (CallPilot, Symposium, Meridian Mail, and so on.).
10 Check dial tone.
End of Procedure
Switch call processing
Procedure 57
Switching call processing
Core/Net 0 is now the active call processor.
End of Procedure
LD 60 Load program
SSCK x Get status of the clock controllers (x is “0” or “1”
for Clock 0 or Clock 1)
SWCK Switch the Clock (if necessary)
**** Exit program
SWCK Switch Clock
(Wait 30 seconds)
SWCK Switch Clock again
LD 135 Load program
SCPU Switch call processing from Core/Net 1 to Core/Net 0
Vista de pagina 331
1 2 ... 327 328 329 330 331 332 333 334 335 336 337 ... 457 458

Comentarios a estos manuales

Sin comentarios