
30 Commissioning configuration procedures
Table 7
Variable definitions
Variable Value
<netaddr/mask> The IP address and the subnet mask of
the destination network. For example,
11.12.13.14/24.
Entering the subnet mask is optional.
<gateway>
The IP address or interface name of the
gateway. For example, 10.11.12.16.
Verifying the next-hop connection
Use the procedure in this section to verify that the connection from the
management interface successfully connects to the next-hop device.
Prerequisites
•
You must have the IP address of the next-hop device.
Procedure steps
Step Action
1
To ping the next-hop device, enter:
ping <ipaddr>
—End—
Configuring the date
To configure the date, you enter the month, day, and year.
Procedure steps
Step Action
1
To access configuration mode, enter:
configure terminal
2
To configure the date, enter:
date <month> <day> <year>
—End—
Nortel Secure Router 4134
Commissioning
NN47263-302 01.02 Standard
10.0 2 August 2007
Copyright © 2007, Nortel Networks
.
Comentarios a estos manuales