Nortel-networks 1000M Manual de usuario Pagina 157

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 474
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 156
Connecting other battery backup systems 157
Figure 71
NTAK28 breaker assembly location
9
Set the breakers on the NTAK28 Junction Box and on the NTDK70
power supply to OFF.
10
Connect the NTAK0420 cable from the NTAK28 Junction Box to
the power supply in the cabinet.
Secure the cable with the cable retainer in the cabinet.
11
Connect the other end of the DC power cable to the connector on
the NTAK28 Junction Box.
12
Connect the cable from the battery box to the NTAK28 Junction Box
as shown in Figure 72 "NTAK28 circuit breaker assembly" (page
158).
13 Set the breakers on the NTAK28 Junction Box and on the NTDK70
AC power supply to ON.
Nortel Communication Server 1000
Communication Server 1000M and Meridian 1 Small System Installation and Commissioning
NN43011-310 01.04 Standard
Release 5.0 13 May 2008
Copyright © 2008, Nortel Networks
.
Vista de pagina 156
1 2 ... 152 153 154 155 156 157 158 159 160 161 162 ... 473 474

Comentarios a estos manuales

Sin comentarios