
Page 62 of 456 Preparing for installation
NN43021-310 Standard 02.01 December 2007
Preparing the equipment for installation
Use the equipment room floor plan to position equipment. See
Communication Server 1000M and Meridian 1: Large System Planning and
Engineering (NN43021-220) to prepare the equipment room and floor plan.
Procedure 1
Preparing the equipment for installation
1 Remove equipment from the shipping pallets; follow the unpacking
instructions that come with the packaging material.
2 Remove the front and rear covers from each module:
WARNING
A fully loaded column weighs 275 kg (606 lb). More
than one person is required to remove equipment
from shipping pallets.
WARNING
Module covers are not hinged; do not let go of the
cover. Lift the cover away from the module and set it
out of the work area.
Comentarios a estos manuales