112 Symposium Call Center Server
Preinstallation checklist Standard 1.0
Preinstallation checklist
Introduction
The following checklist includes a list of required and optional components for
the switch, the network and router system, and the CPE. Nortel Networks
recommends that you complete the checklist before attempting to configure the
switch for Symposium Call Center Server.
DMS Components
Component Required Optional Description
DMS-100, SL-100, DMS-
500
Yes Centrex Switch
LPP Frame, LIM, and LIS Yes Link Peripheral Processor
Frame, Link Interface
Module, and Link Interface
Shelf. This is where the
EIU resides.
NTEX22BB Yes (EIU Front) Integrated
Processor and F-BUS
NT9X84AA Yes Ethernet Interface Card
NT9X85AA Yes (EIU Back) Ethernet
Interface
Paddleboard
NT9X0190 Yes AUI Bulkhead Cable
MAU Yes Ethernet AUI to 10Base-T
Transceiver